Premier Trade Syndicate

MINIMIZE DOWNTIME WITH RELIABLE SERVICES

30+ YEARS OF EXPERIENCE FOR TURNKEY WORKS AND SPARE PARTS SUPPLY IN THE POWER SECTOR IN BANGLADESH

Our Services

We are glad to introduce ourselves as one of the leading agencies for installation, maintenance, Overhauling, repairs of all kinds of rotating equipments like Gas, Steam, Hydro Turbine, Generators, Compressors, Pumps, Motors and other power Generating Equipments.

TURNKEY WORK

All range of Mechanical, Electrical, Instrumentation and Control System Package Installation, Testing and Commissioning support.

Spares Parts

All kind of Electrical, Mechanical, Instrumentation and Control System spare parts supply.

MAINTENANCE

We are providing a wide range of services through our dynamic team. We provide full support to our honorable clients.

OUR RESPECTED CLIENTS

We mostly served Government Organization more than 30 years. 

We deal with

we have strong connections with the world famous brand to serve you as per your requirements.

Our Recent Works

Supports the plant owners in sourcing the turbine critical component as per their requirement with a minimal lead time and we have worldwide net work in all range of spare parts.

Spare Parts of Nitrogen Generator for Bibiyana-III 400 MW CCPP, BPDB, Habiganj, Bangladesh.
Pumps, Valves and Air dryer’s fast-moving spares for BOP of Ghorashal 3rd Unit Re-powered CCPP, Ghorashal Power Station, BPDB, Palash, Narsingdi, Bangladesh
Different types Field Instruments and Measuring Devices [Transmitter, Actuator, Positioner, Digital Valve Controller (DVC), Limit switch] for Gas Turbine(GT) and Balance of plant (BOP) of Ghorashal 4th unit Re-Powered CCPP, BPDB, Palash, Narsingdi, Bangladesh.
Installation, Testing and Commissioning of 60V, 1250A rectifier with Transformer in Ghorashal Power Station.
Spare Parts of Induced Draft Cooling Tower (IDCT) for Shikalbaha 225MW Dual Fuel CCPP, BPDB, Chattogram, Bangladesh.
Heat Exchanger, Voltage Transformer, Oil Mist Detector of Engine for Santahar 50 MW Peaking Power Plant, BPDB, Santahar, Bogura, Bangladesh.
3 Way Hydraulic Damper Set of HRSG for Fenchuganj CCPP, BPDB.
Escort TMS-6141 PD analyzer with required accessories and Configuration-Analysis software TMS-2141, PPG-0010, PD Pulse Generator Calibrator, PDC17.5-1000 Partial Discharge Coupling Capacitors, GTG with Testing and Measuring Tools for Sirajganj 225 MW Combined Cycle Power Plant (1st Unit)
Magnetic Starter, Relay, Fuse, MCB, MCCB, Excitation Panel Cooling Fan etc for Ghorashal Power Station.

Send us your Quarry....